NCCER Power Line Worker: Distribution Level 2
Issued by
NCCER
This individual has demonstrated the ability to: • Explain how alternating current is developed • Identify types of AC circuits • Describe the functions of inductors, capacitors, and transformers • Identify aerial load management devices and their functions • Assemble overhead streetlights • Use hot sticks and load break tools • Install, splice, and terminate cables and conductors • Safely operate cable-pulling equipment • Install lightening protection in URD systems …see more skills below.
- Type Validation
- Time Hours
Skills
Earning Criteria
-
…skills continued… • Install fault-indicating devices in URD systems • Describe trenching methods for URD systems • Identify switchgear, transformers, and conductors used in URD systems • Install single- and three-phase overhead loops • Install risers on poles • Terminate underground secondary services • Inspect/maintain distribution lines • Re-conductor overhead lines • Test, inspect, and replace aerial transformers • Replace cross-arms, arresters, switches, insulators, and related hardware