Level 3 NVQ Diploma in Wood Occupations (Construction) - Timber Frame Erection (6571-57)
Issued by
City & Guilds
This qualification is aimed at learners who have some knowledge and basic skills working with wood - probably from a role where you work under supervision. This qualification demonstrate your ability to work safely and competently to a recognised national standard. Suitable for learners aged 16 and over. Ofqual Accreditation No:603/5962/6
Earning Criteria
-
They are able to:
-
comply with all workplace health, safety and welfare legislation requirements recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures ; Comply with organisational policies and procedures to contribute to health, safety and welfare work responsibly to Contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area
-
Comply with and support all organisational security arrangements and approved procedures ; Identify work activities, assess required resources and plan the sequence of work ; Obtain clarification and advice where the resources required are not available ; Evaluate the work activities and the requirements of any significant external factors against the project requirements
-
Identify work activities which influence each other and make the best use of the resources available ; Identify changed circumstances that require alterations to the work programme and justify them to decision makers; Assess available project data accurately to determine the occupational method of work ; Obtain additional information from alternative sources in cases where the available project data is insufficient
-
Identify work methods that will make best use of resources and meet project, statutory and contractual requirements ;Confirm and communicate the selected work method to relevant personnel ; Interpret the given information relating to the work and resources when erecting timber roof structures ; Know how to comply with relevant legislation and official guidance when erecting timber roof structures Maintain safe and healthy working practices when erecting timber roof structures
-
Select the required quantity and quality of resources for the methods of work to erect timber roof structures ; Minimise the risk of damage to the work and surrounding area when erecting timber roof structures ; Complete the work within the allocated time when erecting timber roof structures ; Comply with the given contract information to erect timber roof structures to the required specification
-
Interpret the given information relating to the work and resources when erecting timber walls and floors ; Know how to comply with relevant legislation and official guidance when erecting timber walls and floors Maintain safe and healthy working practices when erecting timber walls and floors ; Select the required quantity and quality of resources for the methods of work to erect timber walls and floors
-
Minimise the risk of damage to the work and surrounding area when erecting timber walls and floors ; Complete the work within the allocated time when erecting timber walls and floors ; Comply with the given contract information to erect timber walls and floors to the required specification ; Develop, maintain and encourage working relationships to promote good will and trust ; Inform relevant people about work activities in an appropriate level of detail, with the appropriate level of urgency
-
Offer advice and help to relevant people about work activities and encourage questions/requests for clarification and comments ; Clarify proposals with relevant people and discuss alternative suggestions ; Resolve differences of opinion in ways that minimise offence and maintain goodwill, trust and respect ; Erecting roof structure carcassing components ; Know how to comply with relevant legislation and official guidance when erecting roof structure carcassing components
-
Maintain safe working practices when erecting roof structure carcassing components ; Select the required quantity and quality of resources for the methods of work to erect roof structure carcassing components ; Minimise the risk of damage to the work and surrounding area when erecting roof structure carcassing components ;Complete the work within the allocated time when erecting roof structure carcassing components ; Comply with the given contract information to erect roof structure
-
Carcassing components to the required specification ; Co-ordinate with and communicate accurate work information to work colleague ; Confirm and measure dimensional controls and maintain them to the specified work requirements; Check and adjust measuring and recording equipment to the specified accuracy; Identify any deviations in dimensional controls and ensure they are corrected in accordance with work requirements ; Identify circumstances and conditions that require revision of work practices
-
They may be able to:
-
Interpret the given information relating to the preparation for and the slinging and signalling of loads ; Organise with others the sequence and operation in which the slinging and signalling of loads is to be carried out Know how to comply with relevant legislation and official guidance to carry out slinging and signalling of loads ; Maintain safe and healthy working practices when preparing for and slinging and signalling loads
-
Select the required quantity and quality of resources to prepare for and when slinging and signalling loads ; Minimise the risk of damage to the work and surrounding area when preparing to and slinging and signalling loads ; Complete the work within the allocated time when preparing to and slinging and signalling loads ; Comply with the given contract information to prepare to and sling and signal suspended loads for movement to the required specification
-
Select the required quantity and quality of resources to prepare for and when slinging and signalling loads ; Minimise the risk of damage to the work and surrounding area when preparing to and slinging and signalling loads ; Complete the work within the allocated time when preparing to and slinging and signalling loads ; Comply with the given contract information to prepare to and sling and signal suspended loads for movement to the required specification